All posts in category Greenland Kayak

Spring Kayaking – Start Kayaking


Hey the waters high, the temperature warm, time to start kayaking if you have been thinking about it.  I paddled early Saturday morning and it was very relaxing and peaceful.  The power boats are not out in force yet, many wait till after the Memorial Day holiday or until schools out before they get onto […]

Getting Ready To Start Kayaking My Greenland Boat


I have four coats of Dura Tuff polyurethane coating on my Greenland kayak, I’m not happy with the look so wanted to add one last coat.  Unfortunately Michigan weather in the last week has been less than optimum to put on the coating outside.  Then once the last coat cures,  the fun begins to get […]

Greenland Kayak Build Ends Abruptly


Well our Greenland Kayak build is officially done for this year as the Livonia warehouse lease expires.  There was a flurry of activity in the last week to get as much done as possible before the move out.  A few of the people that were behind in schedule came on strong and got skin on […]

Greenland Kayaking Building Week 13


Getting close to the end of the Greenland kayak building session, now up to week 13 and the end of April.  Many of the boats are getting their skin sewn on, skin dyed, and the first boat got a seal coat (one of three coats).  The pressure is this week to complete the kayaks as […]

Easter Weekend Greenland Kayak Building – Week 12


The Greenland style kayak “skin on frame” building is now about cutting and sewing the skin.  Four boats are getting skinned a fifth is ready for next week.  The sewing is a learn as you go process, we are using the method shown on the Skin Boat Site. There are several methods to sew, this […]

Greenland Kayak “Skin On Frame” Building Week 11


Second session of Greenland Kayak Building week 11, was used to make coamings, and finish Masiks. The steamer cranked up to bend the coamings around forms made to fit the individual Kayaks.  I added a new aluminum strip to an existing fixture and drilled some more holes for clamps. I was able to use a […]

Greenland Kayak Building Week 11


We are pretty much on schedule for Greenland Kayak Building, many of the boats the frame is done and has a sealing finish on it, for several others they are only a couple days behind.  Unfortunately days jobs and travel has kept some people away from build days.  The facility is only rented though April, […]

Greenland Kaya “Skin On Frame” Building Session 10


Finishing up the Greenland kayak top decks this week, floor boards being added, finish sanding the frame. Putting on a coating of linseed oil to protect the wood. The “skin” was cut for each boat. Next is to make the coaming and on to the sewing.

Greenland Kayak Building Week 9 – Start Kayaking


This week all the remaining Greenland boats were doing ribs, others were working on the end plates, Steffen was fixturing and bending/gluing his Masik (pronounced Maasheek). The Masik is the last major beam to add and is top side just in front of the paddler. The Masik can be made many ways; from laminated and […]

Greenland “Skin On Frame” Building Week 8 – End of March


The Greenland kayak “skin on frame” building is getting exciting as the ribs are being added to 5 boats, stems being worked on (front and back part).  For two of the boats the ribs, the stems,  keelson, and chimes are completed.  These two boat the bottom side is complete, turned over and top side being […]